Two separate capacity constraints are discussed in this
Two separate capacity constraints are discussed in this
Two separate capacity constraints are discussed in this chapter: (1) the actual physical capacity of existing plants and equipment, shown as the vertical portion of the short-run AS curve, and (2) potential GDP, leading to a vertical long-run AS curve. Explain the difference between the two.